IAC logo
IAC Assessment: OR0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Laminated Panels
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 140,000
Annual Production 72,700,000 Thousand Feet
Production Hrs. Annual 0
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,253 4,625,147 kWh $0.03
Electricity Demand $27,309 8,534 kW-months/year $3.20
Electricity Fees $6,636 - $ -
Natural Gas $152,665 43,049 MMBtu $3.55
LPG $29,543 4,304 MMBtu $6.86
TOTAL ENERGY COSTS $441,158
RECOMMENDED SAVINGS* $29,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,674
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$5,486
Cost:
$500
- - - - $5,486 1,469 - - -
-
kWh
-
-
kW-months/year
$5,486
1,469
MMBtu
-
-
lb
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$16,215
Cost:
$6,816
- - - - $16,215 4,253 - - -
-
kWh
-
-
kW-months/year
$16,215
4,253
MMBtu
-
-
lb
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$4,674
Cost:
-
- - - - $4,674 1,348 - - -
-
kWh
-
-
kW-months/year
$4,674
1,348
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,213
Cost:
$1,000
$2,000 58,910 $213 66 - - - - $2,000
58,910
kWh
$213
66
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$970
Cost:
-
- - - - - - $970 107,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$970
107,600
lb
TOTAL RECOMMENDED Savings:
$29,558
Cost:
$8,316
$2,000 58,910 $213 66 $26,375 7,070 $970 107,600 $2,000
58,910
kWh
$213
66
kW-months/year
$26,375
7,070
MMBtu
$970
107,600
lb
TOTAL IMPLEMENTED Savings:
$4,674
Cost:
-
- - - - $4,674 1,348 - - -
-
kWh
-
-
kW-months/year
$4,674
1,348
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)