IAC logo
IAC Assessment: OR0330
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0330
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product LCD
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 375
Plant Area (Sq.Ft.) 160,000
Annual Production 891,000 Pieces
Production Hrs. Annual 2,500
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,026 16,967,468 kWh $0.02
Electricity Demand $104,676 26,172 kW-months/year $4.00
Electricity Fees $11,660 - $ -
Natural Gas $71,466 16,996 MMBtu $4.20
TOTAL ENERGY COSTS $594,152
RECOMMENDED SAVINGS* $515,578 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,900
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$335,710
Cost:
$438,500
$(-30,650) (-1,452,521) $(-11,620) (-2,904) - - $(-12,800) - $390,780 - $(-30,650)
(-1,452,521)
kWh
$(-11,620)
(-2,904)
kW-months/year
-
-
MMBtu
$(-12,800)
-
$
$390,780
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,900
Cost:
-
$4,900 233,294 - - - - - - - - $4,900
233,294
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$690
Cost:
-
$690 32,532 - - - - - - - - $690
32,532
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$163,740
Cost:
$125,000
$135,040 6,398,886 - - $28,700 7,120 - - - - $135,040
6,398,886
kWh
-
-
kW-months/year
$28,700
7,120
MMBtu
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,538
Cost:
$14,800
$10,538 216,882 - - - - - - - - $10,538
216,882
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$515,578
Cost:
$578,300
$120,518 5,429,073 $(-11,620) (-2,904) $28,700 7,120 $(-12,800) - $390,780 - $120,518
5,429,073
kWh
$(-11,620)
(-2,904)
kW-months/year
$28,700
7,120
MMBtu
$(-12,800)
-
$
$390,780
-
$
TOTAL IMPLEMENTED Savings:
$4,900
Cost:
-
$4,900 233,294 - - - - - - - - $4,900
233,294
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost