IAC logo
IAC Assessment: OR0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1998
Principal Product Semiconductors
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 40,000
Annual Production 40,611 Pieces
Production Hrs. Annual 6,024
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $203,256 5,977,140 kWh $0.03
Electricity Demand $31,495 10,127 kW-months/year $3.11
Electricity Fees $10,067 - $ -
Natural Gas $28,750 5,601 MMBtu $5.13
TOTAL ENERGY COSTS $305,283
RECOMMENDED SAVINGS* $350,545 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,355
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$347,930
Cost:
$644,800
$(-49,670) (-1,461,313) $(-9,050) (-2,910) - - $(-19,050) - $425,700 - $(-49,670)
(-1,461,313)
kWh
$(-9,050)
(-2,910)
kW-months/year
-
-
gal
$(-19,050)
-
$
$425,700
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,045
Cost:
$1,000
$884 26,084 $161 52 - - - - - - $884
26,084
kWh
$161
52
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,260
Cost:
-
$1,066 31,360 $194 62 - - - - - - $1,066
31,360
kWh
$194
62
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$310
Cost:
-
- - - - $310 - - - - - -
-
kWh
-
-
kW-months/year
$310
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$350,545
Cost:
$645,800
$(-47,720) (-1,403,869) $(-8,695) (-2,796) $310 - $(-19,050) - $425,700 - $(-47,720)
(-1,403,869)
kWh
$(-8,695)
(-2,796)
kW-months/year
$310
-
gal
$(-19,050)
-
$
$425,700
-
$
TOTAL IMPLEMENTED Savings:
$1,355
Cost:
$1,000
$884 26,084 $161 52 $310 - - - - - $884
26,084
kWh
$161
52
kW-months/year
$310
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Personnel Changes Ancillary Material Cost