IAC logo
IAC Assessment: OR0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product ABS & CPVC Pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 75,000
Annual Production 24,162,868 Pounds
Production Hrs. Annual 7,200
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,578 6,164,420 kWh $0.03
Electricity Demand $26,306 10,080 kW-months/year $2.61
Electricity Fees $3,676 - $ -
Natural Gas $2,215 417 MMBtu $5.31
TOTAL ENERGY COSTS $248,443
RECOMMENDED SAVINGS* $156,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,300
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Primary Raw Material Electricity Usage Electricity Fees Personnel Changes Primary Raw Material
$ kWh $ $ $ $ $ $
01: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$93,600
Cost:
$200,000
- - - - - - $93,600 - -
-
kWh
-
-
$
-
-
$
$93,600
-
$
02: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$31,700
Cost:
-
- - - - $31,700 - - - -
-
kWh
-
-
$
$31,700
-
$
-
-
$
03: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$27,050
Cost:
$8,200
$27,050 796,014 - - - - - - $27,050
796,014
kWh
-
-
$
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,716
Cost:
$10,200
- - $3,716 - - - - - -
-
kWh
$3,716
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$156,066
Cost:
$218,400
$27,050 796,014 $3,716 - $31,700 - $93,600 - $27,050
796,014
kWh
$3,716
-
$
$31,700
-
$
$93,600
-
$
TOTAL IMPLEMENTED Savings:
$125,300
Cost:
$200,000
- - - - $31,700 - $93,600 - -
-
kWh
-
-
$
$31,700
-
$
$93,600
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Primary Raw Material Electricity Usage Electricity Fees Personnel Changes Primary Raw Material