IAC Assessment: OR0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product PVC Pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 225,000
Annual Production 73,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,643 9,688,453 kWh $0.04
Electricity Demand $57,201 173,028 kW-months/year $0.33
Electricity Fees $6,248 - $ -
Natural Gas $28,300 5,520 MMBtu $5.13
LPG $12,644 1,933 MMBtu $6.54
TOTAL ENERGY COSTS $517,148
RECOMMENDED SAVINGS* $101,441 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,009
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ lb $ $ $ $ $ $ $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$44,432
Cost:
$21,400
$44,432 1,334,701 - - - - - - - - - - $44,432
1,334,701
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,060
Cost:
-
- - - - - - $2,060 - - - - - -
-
kWh
-
-
lb
-
-
$
$2,060
-
$
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,949
Cost:
$13,663
$9,949 251,172 - - - - - - - - - - $9,949
251,172
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$34,000
Cost:
$73,000
- - $1,200 39,000 $15,500 - - - $17,300 - - - -
-
kWh
$1,200
39,000
lb
$15,500
-
$
-
-
$
$17,300
-
$
-
-
$
05: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$11,000
Cost:
$28,700
- - - - - - - - - - $11,000 - -
-
kWh
-
-
lb
-
-
$
-
-
$
-
-
$
$11,000
-
$
TOTAL RECOMMENDED Savings:
$101,441
Cost:
$136,763
$54,381 1,585,873 $1,200 39,000 $15,500 - $2,060 - $17,300 - $11,000 - $54,381
1,585,873
kWh
$1,200
39,000
lb
$15,500
-
$
$2,060
-
$
$17,300
-
$
$11,000
-
$
TOTAL IMPLEMENTED Savings:
$23,009
Cost:
$42,363
$9,949 251,172 - - - - $2,060 - - - $11,000 - $9,949
251,172
kWh
-
-
lb
-
-
$
$2,060
-
$
-
-
$
$11,000
-
$
Savings
Cost
$ kWh $ lb $ $ $ $ $ $ $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product