Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1999 |
Principal Product | Potato Chips |
NAICS | n/a |
SIC | 2096 - Potato Chips And Similar Snacks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 18,000,000 Pounds |
Production Hrs. Annual | 4,640 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $44,360 | 1,314,478 | kWh | $0.03 |
Electricity Demand | $10,176 | 3,876 | kW-months/year | $2.63 |
Electricity Fees | $5,635 | - | $ | - |
Natural Gas | $265,287 | 60,639 | MMBtu | $4.37 |
LPG | $6,332 | 636 | MMBtu | $9.96 |
TOTAL ENERGY COSTS | $380,475 | |||
RECOMMENDED SAVINGS* | $272,866 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,000 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $14,000 Cost: $1,630 |
- | - | - | - | - | - | $14,000 | - |
- - kWh |
- - MMBtu |
- - $ |
$14,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $229,748 Cost: $79,349 |
$(-396) | (-8,792) | - | - | $230,144 | - | - | - |
$(-396) (-8,792) kWh |
- - MMBtu |
$230,144 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $6,574 Cost: $15,045 |
$(-48) | (-1,465) | - | - | $6,622 | - | - | - |
$(-48) (-1,465) kWh |
- - MMBtu |
$6,622 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $9,244 Cost: $1,831 |
- | - | $9,244 | 2,113 | - | - | - | - |
- - kWh |
$9,244 2,113 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $11,400 Cost: $12,250 |
- | - | $11,400 | 2,306 | - | - | - | - |
- - kWh |
$11,400 2,306 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,900 Cost: $1,810 |
- | - | $1,900 | 434 | - | - | - | - |
- - kWh |
$1,900 434 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $272,866 Cost: $111,915 |
$(-444) | (-10,257) | $22,544 | 4,853 | $236,766 | - | $14,000 | - | $(-444) (-10,257) kWh |
$22,544 4,853 MMBtu |
$236,766 - $ |
$14,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,000 Cost: $1,630 |
- | - | - | - | - | - | $14,000 | - | - - kWh |
- - MMBtu |
- - $ |
$14,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||