IAC logo
IAC Assessment: OR0340
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0340
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Industrial gases
NAICS n/a
SIC 2813 - Industrial Gases
Sales $1,000,000-$5,000,000
# of Employees 3
Plant Area (Sq.Ft.) 40,000
Annual Production 95,762 Thousand Feet
Production Hrs. Annual 8,592
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,003,469 47,109,321 kWh $0.02
Electricity Demand $151,333 756,828 kW-months/year $0.20
Electricity Fees $36,986 - $ -
TOTAL ENERGY COSTS $1,228,060
RECOMMENDED SAVINGS* $254,255 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $250,875
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption By-product Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption By-product Production
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$229,335
Cost:
$1,000
$(-1,445) (-67,995) - - - - $(-3,220) - - - $234,000 - $(-1,445)
(-67,995)
kWh
-
-
kW-months/year
-
-
Tgal
$(-3,220)
-
$
-
-
Tgal
$234,000
-
$
02: 3.4151 MINIMIZE WATER USAGE Savings:
$21,540
Cost:
$1,480
$(-17) (-879) $(-3) (-1) $19,240 3,608,640 - - $2,320 - - - $(-17)
(-879)
kWh
$(-3)
(-1)
kW-months/year
$19,240
3,608,640
Tgal
-
-
$
$2,320
-
Tgal
-
-
$
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,110
Cost:
$5,160
$3,110 145,955 - - - - - - - - - - $3,110
145,955
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$270
Cost:
$680
$270 12,896 - - - - - - - - - - $270
12,896
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$254,255
Cost:
$8,320
$1,918 89,977 $(-3) (-1) $19,240 3,608,640 $(-3,220) - $2,320 - $234,000 - $1,918
89,977
kWh
$(-3)
(-1)
kW-months/year
$19,240
3,608,640
Tgal
$(-3,220)
-
$
$2,320
-
Tgal
$234,000
-
$
TOTAL IMPLEMENTED Savings:
$250,875
Cost:
$2,480
$(-1,462) (-68,874) $(-3) (-1) $19,240 3,608,640 $(-3,220) - $2,320 - $234,000 - $(-1,462)
(-68,874)
kWh
$(-3)
(-1)
kW-months/year
$19,240
3,608,640
Tgal
$(-3,220)
-
$
$2,320
-
Tgal
$234,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption By-product Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Water Consumption By-product Production