IAC logo
IAC Assessment: OR0346
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0346
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 86,000 Pieces
Production Hrs. Annual 5,148
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,704 1,682,005 kWh $0.02
Electricity Demand $15,259 45,648 kW-months/year $0.33
Electricity Fees $2,433 - $ -
Natural Gas $8,001 1,148 MMBtu $6.97
TOTAL ENERGY COSTS $95,119
RECOMMENDED SAVINGS* $185,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $129,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$129,400
Cost:
$58,090
- - - - - - $129,400 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$129,400
-
$
-
-
$
02: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$44,400
Cost:
$5,000
- - - - - - $20,600 - $23,800 - -
-
kWh
-
-
kW-months/year
-
-
lb
$20,600
-
$
$23,800
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,339
Cost:
$2,000
$1,339 40,739 - - - - - - - - $1,339
40,739
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,664
Cost:
$1,430
$3,664 111,372 - - - - - - - - $3,664
111,372
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,077
Cost:
$24,750
$(-26) (-1,172) $(-37) (-10) $7,140 - - - - - $(-26)
(-1,172)
kWh
$(-37)
(-10)
kW-months/year
$7,140
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$185,880
Cost:
$91,270
$4,977 150,939 $(-37) (-10) $7,140 - $150,000 - $23,800 - $4,977
150,939
kWh
$(-37)
(-10)
kW-months/year
$7,140
-
lb
$150,000
-
$
$23,800
-
$
TOTAL IMPLEMENTED Savings:
$129,400
Cost:
$58,090
- - - - - - $129,400 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$129,400
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Product