Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1999 |
Principal Product | Metal Furniture |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 490 |
Plant Area (Sq.Ft.) | 435,600 |
Annual Production | 243,692 Pieces |
Production Hrs. Annual | 5,250 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $509,857 | 12,090,563 | kWh | $0.04 |
Electricity Demand | $55,233 | 282,852 | kW-months/year | $0.20 |
Electricity Fees | $1,362 | - | $ | - |
Natural Gas | $271,499 | 86,557 | MMBtu | $3.14 |
TOTAL ENERGY COSTS | $928,593 | |||
RECOMMENDED SAVINGS* | $2,971,487 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,959,732 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $11,755 Cost: $9,290 |
$9,111 | 242,966 | $2,644 | 1,150 | - | - | - | - | - | - |
$9,111 242,966 kWh |
$2,644 1,150 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $21,932 Cost: $6,000 |
$19,678 | 524,912 | $2,254 | 980 | - | - | - | - | - | - |
$19,678 524,912 kWh |
$2,254 980 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $2,610,000 Cost: $93,000 |
- | - | - | - | - | - | - | - | $2,610,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - $ |
$2,610,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $327,800 Cost: $87,400 |
- | - | - | - | $(-4,700) | - | $332,500 | - | - | - |
- - kWh |
- - kW-months/year |
$(-4,700) - $ |
$332,500 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,971,487 Cost: $195,690 |
$28,789 | 767,878 | $4,898 | 2,130 | $(-4,700) | - | $332,500 | - | $2,610,000 | - | $28,789 767,878 kWh |
$4,898 2,130 kW-months/year |
$(-4,700) - $ |
$332,500 - $ |
$2,610,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,959,732 Cost: $186,400 |
$19,678 | 524,912 | $2,254 | 980 | $(-4,700) | - | $332,500 | - | $2,610,000 | - | $19,678 524,912 kWh |
$2,254 980 kW-months/year |
$(-4,700) - $ |
$332,500 - $ |
$2,610,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Primary Product |