IAC logo
IAC Assessment: OR0347
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0347
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Metal Furniture
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $100,000,000-$500,000,000
# of Employees 490
Plant Area (Sq.Ft.) 435,600
Annual Production 243,692 Pieces
Production Hrs. Annual 5,250
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $509,857 12,090,563 kWh $0.04
Electricity Demand $55,233 282,852 kW-months/year $0.20
Electricity Fees $1,362 - $ -
Natural Gas $271,499 86,557 MMBtu $3.14
TOTAL ENERGY COSTS $928,593
RECOMMENDED SAVINGS* $2,971,487 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,959,732
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$11,755
Cost:
$9,290
$9,111 242,966 $2,644 1,150 - - - - - - $9,111
242,966
kWh
$2,644
1,150
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$21,932
Cost:
$6,000
$19,678 524,912 $2,254 980 - - - - - - $19,678
524,912
kWh
$2,254
980
kW-months/year
-
-
$
-
-
$
-
-
$
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,610,000
Cost:
$93,000
- - - - - - - - $2,610,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$2,610,000
-
$
04: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$327,800
Cost:
$87,400
- - - - $(-4,700) - $332,500 - - - -
-
kWh
-
-
kW-months/year
$(-4,700)
-
$
$332,500
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$2,971,487
Cost:
$195,690
$28,789 767,878 $4,898 2,130 $(-4,700) - $332,500 - $2,610,000 - $28,789
767,878
kWh
$4,898
2,130
kW-months/year
$(-4,700)
-
$
$332,500
-
$
$2,610,000
-
$
TOTAL IMPLEMENTED Savings:
$2,959,732
Cost:
$186,400
$19,678 524,912 $2,254 980 $(-4,700) - $332,500 - $2,610,000 - $19,678
524,912
kWh
$2,254
980
kW-months/year
$(-4,700)
-
$
$332,500
-
$
$2,610,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Primary Product