Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Plastic injection parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 0
Annual Production 21,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,157 4,468,054 kWh $0.04
Electricity Demand $25,702 127,476 kW-months/year $0.20
Electricity Fees $2,568 - $ -
Natural Gas $5,505 1,505 MMBtu $3.66
TOTAL ENERGY COSTS $240,416
RECOMMENDED SAVINGS* $169,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,665
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ $ $ $ $ $
01: 3.2176 INCREASE USE OF AUTOMATION Savings:
$142,000
Cost:
$35,600
- - - - $142,000 - - - -
-
kWh
-
-
$
$142,000
-
$
-
-
$
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$18,900
Cost:
$9,000
- - - - $18,900 - - - -
-
kWh
-
-
$
$18,900
-
$
-
-
$
03: 3.2172 USE AUTOMATIC CLEANING EQUIPMENT Savings:
$3,765
Cost:
$800
- - - - $3,950 - $(-185) - -
-
kWh
-
-
$
$3,950
-
$
$(-185)
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,397
Cost:
$8,000
- - $2,397 - - - - - -
-
kWh
$2,397
-
$
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,099
Cost:
$6,938
$2,099 50,117 - - - - - - $2,099
50,117
kWh
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,161
Cost:
$60,338
$2,099 50,117 $2,397 - $164,850 - $(-185) - $2,099
50,117
kWh
$2,397
-
$
$164,850
-
$
$(-185)
-
$
TOTAL IMPLEMENTED Savings:
$22,665
Cost:
$9,800
- - - - $22,850 - $(-185) - -
-
kWh
-
-
$
$22,850
-
$
$(-185)
-
$
Savings