IAC logo
IAC Assessment: OR0349
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Particle Board
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 96,570
Annual Production 70,135 Thousand Feet
Production Hrs. Annual 8,400
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,458 15,606,096 kWh $0.03
Electricity Demand $66,000 314,652 kW-months/year $0.21
Electricity Fees $(-2,622) - $ -
Natural Gas $12,868 3,534 MMBtu $3.64
TOTAL ENERGY COSTS $483,035
RECOMMENDED SAVINGS* $313,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,343
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ $ $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$40,560
Cost:
$64,125
$40,560 1,568,875 - - - - - - $40,560
1,568,875
kWh
-
-
$
-
-
$
-
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$36,220
Cost:
$98,500
$5,840 225,674 $2,300 - $22,000 - $6,080 - $5,840
225,674
kWh
$2,300
-
$
$22,000
-
$
$6,080
-
$
03: 2.4325 UPGRADE CONVEYORS Savings:
$18,725
Cost:
$46,000
$18,725 724,209 - - - - - - $18,725
724,209
kWh
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,088
Cost:
$10,000
$13,088 506,155 - - - - - - $13,088
506,155
kWh
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,171
Cost:
-
$1,171 45,428 - - - - - - $1,171
45,428
kWh
-
-
$
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$24,695
Cost:
$2,840
$24,695 955,158 - - - - - - $24,695
955,158
kWh
-
-
$
-
-
$
-
-
$
07: 3.2176 INCREASE USE OF AUTOMATION Savings:
$179,000
Cost:
$42,000
- - $179,000 - - - - - -
-
kWh
$179,000
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$313,459
Cost:
$263,465
$104,079 4,025,499 $181,300 - $22,000 - $6,080 - $104,079
4,025,499
kWh
$181,300
-
$
$22,000
-
$
$6,080
-
$
TOTAL IMPLEMENTED Savings:
$78,343
Cost:
$76,965
$78,343 3,030,188 - - - - - - $78,343
3,030,188
kWh
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Personnel Changes Administrative Changes Ancillary Material Cost