IAC Assessment: OR0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Nonferrous machine parts
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $100,000,000-$500,000,000
# of Employees 489
Plant Area (Sq.Ft.) 173,000
Annual Production 1,579,000 Pounds
Production Hrs. Annual 7,680
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $725,344 22,253,224 kWh $0.03
Electricity Demand $278,486 939,492 kW-months/year $0.30
Electricity Fees $9,671 - $ -
Natural Gas $576,128 155,045 MMBtu $3.72
TOTAL ENERGY COSTS $1,930,902
RECOMMENDED SAVINGS* $178,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,594
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ Tgal $ lb $ lb $ $ $ $ $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$44,724
Cost:
-
$27,866 783,705 $16,858 2,468 - - - - - - - - - - - - - - $27,866
783,705
kWh
$16,858
2,468
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,870
Cost:
-
$4,750 133,646 $120 209 - - - - - - - - - - - - - - $4,750
133,646
kWh
$120
209
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.2176 INCREASE USE OF AUTOMATION Savings:
$55,130
Cost:
$144,750
- - - - - - - - - - $57,730 - - - $(-2,600) - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
$57,730
-
$
-
-
$
$(-2,600)
-
$
-
-
$
04: 3.2176 INCREASE USE OF AUTOMATION Savings:
$30,485
Cost:
$15,439
- - - - - - - - - - $30,485 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
$30,485
-
$
-
-
$
-
-
$
-
-
$
05: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$20,080
Cost:
$32,300
- - - - - - - - - - $2,840 - $17,240 - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
$2,840
-
$
$17,240
-
$
-
-
$
-
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$5,926
Cost:
$7,000
$(-14) (-293) - - - - - - - - $5,940 - - - - - - - $(-14)
(-293)
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
$5,940
-
$
-
-
$
-
-
$
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$9,531
Cost:
$3,000
- - - - - - $3,726 100,000 $4,805 98,000 - - - - - - $1,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,726
100,000
lb
$4,805
98,000
lb
-
-
$
-
-
$
-
-
$
$1,000
-
$
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$7,780
Cost:
$2,016
$(-45) (-1,172) $(-30) (-4) $7,855 1,680,000 - - - - - - - - - - - - $(-45)
(-1,172)
kWh
$(-30)
(-4)
kW-months/year
$7,855
1,680,000
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$178,526
Cost:
$204,505
$32,557 915,886 $16,948 2,673 $7,855 1,680,000 $3,726 100,000 $4,805 98,000 $96,995 - $17,240 - $(-2,600) - $1,000 - $32,557
915,886
kWh
$16,948
2,673
kW-months/year
$7,855
1,680,000
Tgal
$3,726
100,000
lb
$4,805
98,000
lb
$96,995
-
$
$17,240
-
$
$(-2,600)
-
$
$1,000
-
$
TOTAL IMPLEMENTED Savings:
$49,594
Cost:
-
$32,616 917,351 $16,978 2,677 - - - - - - - - - - - - - - $32,616
917,351
kWh
$16,978
2,677
kW-months/year
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Ancillary Material Cost By-product Production