IAC logo
IAC Assessment: OR0357
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0357
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Surimi,Fish,Shrimp,Crab
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 40,000
Annual Production 16,790,000 Pounds
Production Hrs. Annual 3,600
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,501 4,359,320 kWh $0.03
Electricity Demand $31,907 113,280 kW-months/year $0.28
Electricity Fees $5,027 - $ -
Natural Gas $24,647 4,924 MMBtu $5.01
LPG $7,218 512 MMBtu $14.10
TOTAL ENERGY COSTS $220,153
RECOMMENDED SAVINGS* $724,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,771
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$423,000
Cost:
$140,000
- - - - - - $437,000 - - - $(-14,000) - -
-
kWh
-
-
kW-months/year
-
-
$
$437,000
-
$
-
-
$
$(-14,000)
-
$
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$91,000
Cost:
$95,000
- - - - - - $101,000 - - - $(-10,000) - -
-
kWh
-
-
kW-months/year
-
-
$
$101,000
-
$
-
-
$
$(-10,000)
-
$
03: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$2,800
Cost:
$7,000
- - - - - - $2,800 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,800
-
$
-
-
$
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$198,470
Cost:
$500,000
$(-17,140) (-504,103) $(-4,680) (-1,385) - - - - $210,870 - $9,420 - $(-17,140)
(-504,103)
kWh
$(-4,680)
(-1,385)
kW-months/year
-
-
$
-
-
$
$210,870
-
$
$9,420
-
$
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$7,150
Cost:
-
$7,150 210,434 - - - - - - - - - - $7,150
210,434
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,621
Cost:
$4,800
- - - - $1,621 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,621
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$724,041
Cost:
$746,800
$(-9,990) (-293,669) $(-4,680) (-1,385) $1,621 - $540,800 - $210,870 - $(-14,580) - $(-9,990)
(-293,669)
kWh
$(-4,680)
(-1,385)
kW-months/year
$1,621
-
$
$540,800
-
$
$210,870
-
$
$(-14,580)
-
$
TOTAL IMPLEMENTED Savings:
$8,771
Cost:
$4,800
$7,150 210,434 - - $1,621 - - - - - - - $7,150
210,434
kWh
-
-
kW-months/year
$1,621
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Raw Material Ancillary Material Cost