IAC logo
IAC Assessment: OR0358
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0358
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Surimi, Shrimp, Crab
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 4,800,000 Pounds
Production Hrs. Annual 5,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,830 1,995,604 kWh $0.03
Electricity Demand $16,551 68,964 kW-months/year $0.24
Electricity Fees $1,461 - $ -
Natural Gas $10,605 1,854 MMBtu $5.72
LPG $1,812 203 MMBtu $8.93
TOTAL ENERGY COSTS $102,605
RECOMMENDED SAVINGS* $13,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,905
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
-
Cost:
$3,600
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
02: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$2,574
Cost:
$12,750
$2,574 75,615 - - - - $2,574
75,615
kWh
-
-
kW-months/year
-
-
$
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$860
Cost:
$17,000
$860 25,205 - - - - $860
25,205
kWh
-
-
kW-months/year
-
-
$
04: 3.1181 ELIMINATE A BY-PRODUCT Savings:
$9,905
Cost:
$2,000
$1,380 40,739 $125 174 $8,400 - $1,380
40,739
kWh
$125
174
kW-months/year
$8,400
-
$
TOTAL RECOMMENDED Savings:
$13,339
Cost:
$35,350
$4,814 141,559 $125 174 $8,400 - $4,814
141,559
kWh
$125
174
kW-months/year
$8,400
-
$
TOTAL IMPLEMENTED Savings:
$9,905
Cost:
$2,000
$1,380 40,739 $125 174 $8,400 - $1,380
40,739
kWh
$125
174
kW-months/year
$8,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes