IAC logo
IAC Assessment: OR0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Fish, crab, shrimp
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 30,000
Annual Production 18,200,000 Pounds
Production Hrs. Annual 2,032
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,750 1,716,882 kWh $0.03
Electricity Demand $14,269 5,244 kW-months/year $2.72
Electricity Fees $9,483 - $ -
Natural Gas $29,255 6,328 MMBtu $4.62
TOTAL ENERGY COSTS $121,201
RECOMMENDED SAVINGS* $88,298 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,013
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$80,000
Cost:
$95,000
- - - - - - $90,000 - $(-10,000) - -
-
kWh
-
-
kW-months/year
-
-
$
$90,000
-
$
$(-10,000)
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$2,013
Cost:
-
$2,013 60,375 - - - - - - - - $2,013
60,375
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,648
Cost:
$9,500
$3,197 34,584 $451 121 - - - - - - $3,197
34,584
kWh
$451
121
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$786
Cost:
$2,200
- - - - $786 - - - - - -
-
kWh
-
-
kW-months/year
$786
-
$
-
-
$
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$1,851
Cost:
$10,000
- - - - $1,851 - - - - - -
-
kWh
-
-
kW-months/year
$1,851
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$88,298
Cost:
$116,700
$5,210 94,959 $451 121 $2,637 - $90,000 - $(-10,000) - $5,210
94,959
kWh
$451
121
kW-months/year
$2,637
-
$
$90,000
-
$
$(-10,000)
-
$
TOTAL IMPLEMENTED Savings:
$2,013
Cost:
-
$2,013 60,375 - - - - - - - - $2,013
60,375
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost