Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1999 |
Principal Product | Soy Sauce |
NAICS | n/a |
SIC | 2035 - Pickles, Sauces, And Salad Dressings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 28 |
Plant Area (Sq.Ft.) | 42,800 |
Annual Production | 1,696,200 Thousand Gallons |
Production Hrs. Annual | 2,250 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,403 | 2,565,358 | kWh | $0.03 |
Electricity Demand | $33,782 | 88,776 | kW-months/year | $0.38 |
Electricity Fees | $240 | - | $ | - |
Natural Gas | $86,360 | 19,260 | MMBtu | $4.48 |
TOTAL ENERGY COSTS | $263,131 | |||
RECOMMENDED SAVINGS* | $54,047 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,014 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM |
Savings: $9,585 Cost: $2,840 |
$8,282 | 247,362 | $1,303 | 302 | - | - | - | - | - | - | - | - | - | - | - | - |
$8,282 247,362 kWh |
$1,303 302 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,909 Cost: - |
- | - | - | - | $1,909 | 445 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,909 445 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $6,248 Cost: $20,000 |
- | - | - | - | $6,248 | 1,458 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,248 1,458 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $18,785 Cost: $67,680 |
- | - | - | - | - | - | $23,345 | - | $(-1,000) | (-102,261) | $2,290 | - | $(-5,850) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$23,345 - Tgal |
$(-1,000) (-102,261) lb |
$2,290 - $ |
$(-5,850) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED |
Savings: $17,520 Cost: $2,000 |
- | - | - | - | - | - | - | - | $10,800 | 672,000 | - | - | - | - | $6,720 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$10,800 672,000 lb |
- - $ |
- - $ |
$6,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $54,047 Cost: $92,520 |
$8,282 | 247,362 | $1,303 | 302 | $8,157 | 1,903 | $23,345 | - | $9,800 | 569,739 | $2,290 | - | $(-5,850) | - | $6,720 | - | $8,282 247,362 kWh |
$1,303 302 kW-months/year |
$8,157 1,903 MMBtu |
$23,345 - Tgal |
$9,800 569,739 lb |
$2,290 - $ |
$(-5,850) - $ |
$6,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,014 Cost: $4,840 |
$8,282 | 247,362 | $1,303 | 302 | $1,909 | 445 | - | - | $10,800 | 672,000 | - | - | - | - | $6,720 | - | $8,282 247,362 kWh |
$1,303 302 kW-months/year |
$1,909 445 MMBtu |
- - Tgal |
$10,800 672,000 lb |
- - $ |
- - $ |
$6,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | By-product Production |