IAC logo
IAC Assessment: OR0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Soy Sauce
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 42,800
Annual Production 1,696,200 Thousand Gallons
Production Hrs. Annual 2,250
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,403 2,565,358 kWh $0.03
Electricity Demand $33,782 88,776 kW-months/year $0.38
Electricity Fees $240 - $ -
Natural Gas $86,360 19,260 MMBtu $4.48
TOTAL ENERGY COSTS $263,131
RECOMMENDED SAVINGS* $54,047 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,014
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$9,585
Cost:
$2,840
$8,282 247,362 $1,303 302 - - - - - - - - - - - - $8,282
247,362
kWh
$1,303
302
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,909
Cost:
-
- - - - $1,909 445 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,909
445
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$6,248
Cost:
$20,000
- - - - $6,248 1,458 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,248
1,458
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$18,785
Cost:
$67,680
- - - - - - $23,345 - $(-1,000) (-102,261) $2,290 - $(-5,850) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$23,345
-
Tgal
$(-1,000)
(-102,261)
lb
$2,290
-
$
$(-5,850)
-
$
-
-
$
05: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$17,520
Cost:
$2,000
- - - - - - - - $10,800 672,000 - - - - $6,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,800
672,000
lb
-
-
$
-
-
$
$6,720
-
$
TOTAL RECOMMENDED Savings:
$54,047
Cost:
$92,520
$8,282 247,362 $1,303 302 $8,157 1,903 $23,345 - $9,800 569,739 $2,290 - $(-5,850) - $6,720 - $8,282
247,362
kWh
$1,303
302
kW-months/year
$8,157
1,903
MMBtu
$23,345
-
Tgal
$9,800
569,739
lb
$2,290
-
$
$(-5,850)
-
$
$6,720
-
$
TOTAL IMPLEMENTED Savings:
$29,014
Cost:
$4,840
$8,282 247,362 $1,303 302 $1,909 445 - - $10,800 672,000 - - - - $6,720 - $8,282
247,362
kWh
$1,303
302
kW-months/year
$1,909
445
MMBtu
-
-
Tgal
$10,800
672,000
lb
-
-
$
-
-
$
$6,720
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production