Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2000 |
Principal Product | Manufatured Homes |
NAICS | n/a |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 1,075 Pieces |
Production Hrs. Annual | 1,920 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,707 | 3,888,000 | kWh | $0.02 |
Electricity Demand | $15,316 | 54,780 | kW-months/year | $0.28 |
Electricity Fees | $960 | - | $ | - |
Natural Gas | $74,529 | 14,016 | MMBtu | $5.32 |
TOTAL ENERGY COSTS | $183,924 | |||
RECOMMENDED SAVINGS* | $53,646 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,848 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,216 Cost: $4,300 |
$4,441 | 125,733 | $3,775 | 786 | - | - | - | - | - | - |
$4,441 125,733 kWh |
$3,775 786 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $618 Cost: - |
$329 | 9,379 | $289 | 61 | - | - | - | - | - | - |
$329 9,379 kWh |
$289 61 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8112 COMBINE UTILITY METERS |
Savings: $4,844 Cost: $9,721 |
- | - | - | - | $4,844 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,844 - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $35,788 Cost: $1,690 |
- | - | - | - | $35,788 | 7,743 | - | - | - | - |
- - kWh |
- - kW-months/year |
$35,788 7,743 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $4,180 Cost: - |
- | - | - | - | - | - | $5,620 | 460,000 | $(-1,440) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,620 460,000 lb |
$(-1,440) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,646 Cost: $15,711 |
$4,770 | 135,112 | $4,064 | 847 | $40,632 | 7,743 | $5,620 | 460,000 | $(-1,440) | - | $4,770 135,112 kWh |
$4,064 847 kW-months/year |
$40,632 7,743 MMBtu |
$5,620 460,000 lb |
$(-1,440) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,848 Cost: $15,711 |
$4,441 | 125,733 | $3,775 | 786 | $40,632 | 7,743 | - | - | - | - | $4,441 125,733 kWh |
$3,775 786 kW-months/year |
$40,632 7,743 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |