IAC logo
IAC Assessment: OR0366
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0366
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Manufatured Homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 240,000
Annual Production 2,080 Pieces
Production Hrs. Annual 2,340
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,587 1,669,695 kWh $0.04
Electricity Demand $17,554 80,076 kW-months/year $0.22
Electricity Fees $547 - $ -
Natural Gas $67,378 10,901 MMBtu $6.18
Wood $13,166 - MMBtu -
TOTAL ENERGY COSTS $333,716
RECOMMENDED SAVINGS* $32,445 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,516
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,963
Cost:
-
$1,157 32,825 $806 168 - - - - $1,157
32,825
kWh
$806
168
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$365
Cost:
-
$215 6,155 $150 31 - - - - $215
6,155
kWh
$150
31
kW-months/year
-
-
$
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$359
Cost:
$1,200
- - - - $359 - - - -
-
kWh
-
-
kW-months/year
$359
-
$
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,570
Cost:
$7,800
$1,043 19,343 $527 110 - - - - $1,043
19,343
kWh
$527
110
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$28,188
Cost:
$1,410
- - - - - - $28,188 4,566 -
-
kWh
-
-
kW-months/year
-
-
$
$28,188
4,566
MMBtu
TOTAL RECOMMENDED Savings:
$32,445
Cost:
$10,410
$2,415 58,323 $1,483 309 $359 - $28,188 4,566 $2,415
58,323
kWh
$1,483
309
kW-months/year
$359
-
$
$28,188
4,566
MMBtu
TOTAL IMPLEMENTED Savings:
$30,516
Cost:
$1,410
$1,372 38,980 $956 199 - - $28,188 4,566 $1,372
38,980
kWh
$956
199
kW-months/year
-
-
$
$28,188
4,566
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas