IAC logo
IAC Assessment: OR0368
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0368
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Wood pellets, cat litter
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 0
Annual Production 28,073 Tons
Production Hrs. Annual 4,896
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,063 3,097,800 kWh $0.04
Electricity Demand $23,743 99,024 kW-months/year $0.24
Natural Gas $211,258 57,644 MMBtu $3.66
TOTAL ENERGY COSTS $363,064
RECOMMENDED SAVINGS* $78,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$18,890
Cost:
$30,000
$16,250 393,100 $2,640 11,520 - - - - - - - - $16,250
393,100
kWh
$2,640
11,520
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$43,540
Cost:
$401,460
- - - - $44,000 12,246 - - $(-460) - - - -
-
kWh
-
-
kW-months/year
$44,000
12,246
MMBtu
-
-
lb
$(-460)
-
$
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$10,000
Cost:
$4,040
- - - - - - - - $10,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$10,000
-
$
-
-
$
04: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$5,000
Cost:
-
- - - - - - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$5,000
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,515
Cost:
$1,500
- - - - - - $1,515 30,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,515
30,000
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$78,945
Cost:
$437,000
$16,250 393,100 $2,640 11,520 $44,000 12,246 $1,515 30,000 $9,540 - $5,000 - $16,250
393,100
kWh
$2,640
11,520
kW-months/year
$44,000
12,246
MMBtu
$1,515
30,000
lb
$9,540
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$15,000
Cost:
$4,040
- - - - - - - - $10,000 - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$10,000
-
$
$5,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Product