IAC logo
IAC Assessment: OR0371
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0371
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Frozen Onions
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 40,000
Annual Production 30,100,000 Pounds
Production Hrs. Annual 6,744
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,403 5,007,913 kWh $0.02
Electricity Demand $31,583 120,060 kW-months/year $0.26
Natural Gas $59,771 11,103 MMBtu $5.38
TOTAL ENERGY COSTS $271,604
RECOMMENDED SAVINGS* $188,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,823
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Personnel Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $ $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,523
Cost:
$6,600
- - - - $3,523 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,523
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$16,300
Cost:
$20,000
- - - - - - $37,500 6,968 $(-21,700) - - - - - $500 - -
-
kWh
-
-
kW-months/year
-
-
$
$37,500
6,968
MMBtu
$(-21,700)
-
MMBtu
-
-
$
-
-
$
$500
-
Tgal
03: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$142,687
Cost:
$81,200
$(-1,525) (-61,841) $(-508) (-154) - - - - - - $144,720 - - - - - $(-1,525)
(-61,841)
kWh
$(-508)
(-154)
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$144,720
-
$
-
-
$
-
-
Tgal
04: 3.2176 INCREASE USE OF AUTOMATION Savings:
$25,665
Cost:
$2,234
$(-185) (-7,620) $(-150) (-48) - - - - - - - - $26,000 - - - $(-185)
(-7,620)
kWh
$(-150)
(-48)
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
$26,000
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$188,175
Cost:
$110,034
$(-1,710) (-69,461) $(-658) (-202) $3,523 - $37,500 6,968 $(-21,700) - $144,720 - $26,000 - $500 - $(-1,710)
(-69,461)
kWh
$(-658)
(-202)
kW-months/year
$3,523
-
$
$37,500
6,968
MMBtu
$(-21,700)
-
MMBtu
$144,720
-
$
$26,000
-
$
$500
-
Tgal
TOTAL IMPLEMENTED Savings:
$19,823
Cost:
$26,600
- - - - $3,523 - $37,500 6,968 $(-21,700) - - - - - $500 - -
-
kWh
-
-
kW-months/year
$3,523
-
$
$37,500
6,968
MMBtu
$(-21,700)
-
MMBtu
-
-
$
-
-
$
$500
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Personnel Changes Primary Raw Material Water Consumption