IAC Assessment: OR0381
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0381
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2000
Principal Product Canned and pureed fruit
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 170,000
Annual Production 8,300,000 Pounds
Production Hrs. Annual 4,223
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,664 1,650,938 kWh $0.04
Electricity Demand $14,948 69,132 kW-months/year $0.22
Natural Gas $54,311 11,142 MMBtu $4.87
TOTAL ENERGY COSTS $140,368
RECOMMENDED SAVINGS* $54,415 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,905
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ Tgal
01: 3.7141 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM Savings:
$27,260
Cost:
-
- - - - - - $12,460 6,844 - - $14,800 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,460
6,844
gal
-
-
$
$14,800
-
$
-
-
Tgal
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$699
Cost:
$300
- - - - $699 149 - - - - - - - - -
-
kWh
-
-
kW-months/year
$699
149
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$540
Cost:
$345
- - - - $540 116 - - - - - - - - -
-
kWh
-
-
kW-months/year
$540
116
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,850
Cost:
$8,600
$(-433) (-14,361) $(-197) (-48) - - - - - - - - $4,480 - $(-433)
(-14,361)
kWh
$(-197)
(-48)
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$4,480
-
Tgal
05: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,096
Cost:
$390
- - - - - - - - - - - - $1,096 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$1,096
-
Tgal
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$20,970
Cost:
$40,500
- - - - - - - - $20,970 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$20,970
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$54,415
Cost:
$50,135
$(-433) (-14,361) $(-197) (-48) $1,239 265 $12,460 6,844 $20,970 - $14,800 - $5,576 - $(-433)
(-14,361)
kWh
$(-197)
(-48)
kW-months/year
$1,239
265
MMBtu
$12,460
6,844
gal
$20,970
-
$
$14,800
-
$
$5,576
-
Tgal
TOTAL IMPLEMENTED Savings:
$32,905
Cost:
$9,290
$(-433) (-14,361) $(-197) (-48) $699 149 $12,460 6,844 - - $14,800 - $5,576 - $(-433)
(-14,361)
kWh
$(-197)
(-48)
kW-months/year
$699
149
MMBtu
$12,460
6,844
gal
-
-
$
$14,800
-
$
$5,576
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Raw Material Water Consumption