Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2001
Principal Product Folding pocket tools
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $100,000,000-$500,000,000
# of Employees 444
Plant Area (Sq.Ft.) 93,500
Annual Production 4,226,511 Pieces
Production Hrs. Annual 5,772
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,519 5,630,129 kWh $0.05
Electricity Demand $53,135 201,252 kW-months/year $0.26
Electricity Fees $12,194 - $ -
TOTAL ENERGY COSTS $330,598
RECOMMENDED SAVINGS* $340,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $326,300
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ lb $ $
01: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$324,000
Cost:
$79,300
- - - - - - - - $324,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$324,000
-
$
02: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,300
Cost:
-
- - - - - - $2,300 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,300
-
lb
-
-
$
03: 2.8112 COMBINE UTILITY METERS Savings:
$8,935
Cost:
$24,325
- - $3,175 - $5,760 - - - - - -
-
kWh
$3,175
-
kW-months/year
$5,760
-
$
-
-
lb
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,855
Cost:
$8,000
- - - - $2,855 - - - - - -
-
kWh
-
-
kW-months/year
$2,855
-
$
-
-
lb
-
-
$
05: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$2,248
Cost:
$6,400
$1,855 53,578 $393 124 - - - - - - $1,855
53,578
kWh
$393
124
kW-months/year
-
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$340,338
Cost:
$118,025
$1,855 53,578 $3,568 124 $8,615 - $2,300 - $324,000 - $1,855
53,578
kWh
$3,568
124
kW-months/year
$8,615
-
$
$2,300
-
lb
$324,000
-
$
TOTAL IMPLEMENTED Savings:
$326,300
Cost:
$79,300
- - - - - - $2,300 - $324,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$2,300
-
lb
$324,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost