IAC logo
IAC Assessment: OR0399
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0399
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2001
Principal Product Kiln-Dryed Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 23,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,014 5,969,480 kWh $0.05
Electricity Demand $8,607 18,180 kW-months/year $0.47
Electricity Fees $11,462 - $ -
TOTAL ENERGY COSTS $306,083
RECOMMENDED SAVINGS* $42,785 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,410
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,030
Cost:
$9,500
- - - - $11,030 - -
-
kWh
-
-
kW-months/year
$11,030
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,410
Cost:
$98,120
$22,410 700,334 - - - - $22,410
700,334
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,926
Cost:
$4,000
$2,798 87,423 $1,128 198 - - $2,798
87,423
kWh
$1,128
198
kW-months/year
-
-
$
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,029
Cost:
$18,400
$2,838 88,695 $1,191 210 - - $2,838
88,695
kWh
$1,191
210
kW-months/year
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,390
Cost:
$6,063
$687 21,454 $703 124 - - $687
21,454
kWh
$703
124
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$42,785
Cost:
$136,083
$28,733 897,906 $3,022 532 $11,030 - $28,733
897,906
kWh
$3,022
532
kW-months/year
$11,030
-
$
TOTAL IMPLEMENTED Savings:
$22,410
Cost:
$98,120
$22,410 700,334 - - - - $22,410
700,334
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees