IAC logo
IAC Assessment: OR0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2001
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 119
Plant Area (Sq.Ft.) 0
Annual Production 111,461 Thousand Feet
Production Hrs. Annual 4,518
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,996 7,741,800 kWh $0.03
Electricity Demand $64,989 20,628 kW-months/year $3.15
Electricity Fees $64,156 - $ -
Natural Gas $1,155 138 MMBtu $8.37
TOTAL ENERGY COSTS $370,296
RECOMMENDED SAVINGS* $1,301,444 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $916,086
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$265,366
Cost:
$900,000
$(-1,867) (-60,240) $(-567) (-180) - - $284,300 - $(-16,500) - - - $(-1,867)
(-60,240)
kWh
$(-567)
(-180)
kW-months/year
-
-
$
$284,300
-
$
$(-16,500)
-
$
-
-
$
02: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$879,623
Cost:
$145,450
$1,245 40,160 $378 120 - - - - - - $878,000 - $1,245
40,160
kWh
$378
120
kW-months/year
-
-
$
-
-
$
-
-
$
$878,000
-
$
03: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$116,900
Cost:
$20,000
- - - - - - - - $(-1,100) - $118,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$(-1,100)
-
$
$118,000
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,987
Cost:
$28,200
- - - - $17,987 - - - - - - - -
-
kWh
-
-
kW-months/year
$17,987
-
$
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,599
Cost:
$4,500
$3,900 125,816 $699 222 - - - - - - - - $3,900
125,816
kWh
$699
222
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$13,877
Cost:
$4,000
$13,284 428,510 $593 188 - - - - - - - - $13,284
428,510
kWh
$593
188
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,092
Cost:
$13,700
$2,372 76,500 $720 228 - - - - - - - - $2,372
76,500
kWh
$720
228
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,301,444
Cost:
$1,115,850
$18,934 610,746 $1,823 578 $17,987 - $284,300 - $(-17,600) - $996,000 - $18,934
610,746
kWh
$1,823
578
kW-months/year
$17,987
-
$
$284,300
-
$
$(-17,600)
-
$
$996,000
-
$
TOTAL IMPLEMENTED Savings:
$916,086
Cost:
$182,150
$18,429 594,486 $1,670 530 $17,987 - - - - - $878,000 - $18,429
594,486
kWh
$1,670
530
kW-months/year
$17,987
-
$
-
-
$
-
-
$
$878,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Primary Product