IAC logo
IAC Assessment: OR0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product camping trailers
NAICS n/a
SIC 3792 - Travel Trailers And Campers
Sales $1,000,000-$5,000,000
# of Employees 24
Plant Area (Sq.Ft.) 19,000
Annual Production 300 Pieces
Production Hrs. Annual 2,442
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,050 69,820 kWh $0.06
Electricity Demand $488 336 kW-months/year $1.45
TOTAL ENERGY COSTS $4,538
RECOMMENDED SAVINGS* $1,620,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $214,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product Increase in Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
01: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$10,000
Cost:
$1,200
- - - - - - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$10,000
-
%
02: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$214,000
Cost:
$5,000
- - - - - - - - - - $214,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$214,000
-
%
03: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$142,400
Cost:
$25,000
- - - - - - - - $142,400 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$142,400
-
$
-
-
%
04: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$3,500
Cost:
$2,800
- - - - - - - - $3,500 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$3,500
-
$
-
-
%
05: 4.426 MODIFY WORKLOAD Savings:
$1,250,300
Cost:
$29,300
- - - - $78,200 - $689,200 - - - $482,900 - -
-
kWh
-
-
kW-months/year
$78,200
-
$
$689,200
-
$
-
-
$
$482,900
-
%
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$220
Cost:
$50
$50 1,036 $170 56 - - - - - - - - $50
1,036
kWh
$170
56
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,620,420
Cost:
$63,350
$50 1,036 $170 56 $78,200 - $689,200 - $145,900 - $706,900 - $50
1,036
kWh
$170
56
kW-months/year
$78,200
-
$
$689,200
-
$
$145,900
-
$
$706,900
-
%
TOTAL IMPLEMENTED Savings:
$214,220
Cost:
$5,050
$50 1,036 $170 56 - - - - - - $214,000 - $50
1,036
kWh
$170
56
kW-months/year
-
-
$
-
-
$
-
-
$
$214,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product Increase in Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Primary Product Increase in Production