IAC Assessment: OR0414
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0414
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product Frozen Yogurt
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 0
Annual Production 433 Thousand Gallons
Production Hrs. Annual 2,049
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,220 2,652,728 kWh $0.04
Electricity Demand $31,745 7,212 kW-months/year $4.40
Electricity Fees $1,021 - $ -
TOTAL ENERGY COSTS $141,986
RECOMMENDED SAVINGS* $789,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,502
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$657,000
Cost:
$300,000
- - - - - - - - $657,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$657,000
-
%
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$124,333
Cost:
$56,075
$(-271) (-7,176) $(-196) (-41) - - $124,800 - - - $(-271)
(-7,176)
kWh
$(-196)
(-41)
kW-months/year
-
-
$
$124,800
-
$
-
-
%
03: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$6,650
Cost:
$9,075
$(-44) (-1,178) $(-96) (-20) - - $6,790 - - - $(-44)
(-1,178)
kWh
$(-96)
(-20)
kW-months/year
-
-
$
$6,790
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$852
Cost:
-
$558 14,800 $294 56 - - - - - - $558
14,800
kWh
$294
56
kW-months/year
-
-
$
-
-
$
-
-
%
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$960
Cost:
$2,700
- - - - $960 - - - - - -
-
kWh
-
-
kW-months/year
$960
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$789,795
Cost:
$367,850
$243 6,446 $2 (-5) $960 - $131,590 - $657,000 - $243
6,446
kWh
$2
(-5)
kW-months/year
$960
-
$
$131,590
-
$
$657,000
-
%
TOTAL IMPLEMENTED Savings:
$7,502
Cost:
$9,075
$514 13,622 $198 36 - - $6,790 - - - $514
13,622
kWh
$198
36
kW-months/year
-
-
$
$6,790
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Increase in Production