IAC logo
IAC Assessment: OR0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product Plastics
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 131
Plant Area (Sq.Ft.) 0
Annual Production 169 Tons
Production Hrs. Annual 3,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,029 2,905,101 kWh $0.06
Electricity Demand $13,403 13,008 kW-months/year $1.03
Electricity Fees $1,434 - $ -
Natural Gas $33,317 4,915 MMBtu $6.78
TOTAL ENERGY COSTS $223,588
RECOMMENDED SAVINGS* $48,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$24,100
Cost:
-
$24,100 411,264 - - - - - - - - - - - - $24,100
411,264
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$19,686
Cost:
$63,600
$23,697 404,380 $1,063 1,032 - - $(-5,074) (-762) - - - - - - $23,697
404,380
kWh
$1,063
1,032
kW-months/year
-
-
$
$(-5,074)
(-762)
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$1,324
Cost:
$2,600
$(-717) (-12,238) - - - - - - $505 221,408 - - $1,536 - $(-717)
(-12,238)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$505
221,408
Tgal
-
-
$
$1,536
-
Tgal
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,036
Cost:
$1,800
$1,519 25,920 $89 86 - - - - - - $428 - - - $1,519
25,920
kWh
$89
86
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$428
-
$
-
-
Tgal
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,263
Cost:
$4,125
- - - - $1,263 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,263
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$48,409
Cost:
$72,125
$48,599 829,326 $1,152 1,118 $1,263 - $(-5,074) (-762) $505 221,408 $428 - $1,536 - $48,599
829,326
kWh
$1,152
1,118
kW-months/year
$1,263
-
$
$(-5,074)
(-762)
MMBtu
$505
221,408
Tgal
$428
-
$
$1,536
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption