IAC logo
IAC Assessment: OR0419
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0419
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product 2x4 Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 66,771,013 Thousand Feet
Production Hrs. Annual 4,335
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,187 4,004,460 kWh $0.04
Electricity Demand $35,526 13,680 kW-months/year $2.60
Electricity Fees $5,438 - $ -
Natural Gas $237,382 82,614 MMBtu $2.87
TOTAL ENERGY COSTS $446,533
RECOMMENDED SAVINGS* $30,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,846
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,879
Cost:
-
$15,879 378,062 - - - - - - - - $15,879
378,062
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,392
Cost:
$5,000
$3,744 89,145 $648 270 - - - - - - $3,744
89,145
kWh
$648
270
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,988
Cost:
$3,240
$5,571 132,643 $1,417 590 - - - - - - $5,571
132,643
kWh
$1,417
590
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,581
Cost:
$1,500
- - - - $1,581 328 - - - - -
-
kWh
-
-
kW-months/year
$1,581
328
MMBtu
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,587
Cost:
-
$974 23,180 $291 121 - - $19 - $303 - $974
23,180
kWh
$291
121
kW-months/year
-
-
MMBtu
$19
-
$
$303
-
$
TOTAL RECOMMENDED Savings:
$30,427
Cost:
$9,740
$26,168 623,030 $2,356 981 $1,581 328 $19 - $303 - $26,168
623,030
kWh
$2,356
981
kW-months/year
$1,581
328
MMBtu
$19
-
$
$303
-
$
TOTAL IMPLEMENTED Savings:
$28,846
Cost:
$8,240
$26,168 623,030 $2,356 981 - - $19 - $303 - $26,168
623,030
kWh
$2,356
981
kW-months/year
-
-
MMBtu
$19
-
$
$303
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost