IAC logo
IAC Assessment: OR0420
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0420
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2002
Principal Product Custom machinery
NAICS n/a
SIC 3549 - Metalworking Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 14,533 Pieces
Production Hrs. Annual 5,100
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,654 2,426,550 kWh $0.06
Electricity Demand $18,642 6,779 kW-months/year $2.75
Electricity Fees $3,412 - $ -
Natural Gas $48,090 9,067 MMBtu $5.30
TOTAL ENERGY COSTS $203,798
RECOMMENDED SAVINGS* $74,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,098
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$39,861
Cost:
$1,920
$1,671 30,341 $50 220 $5,500 1,064 $32,640 - - - $1,671
30,341
kWh
$50
220
kW-months/year
$5,500
1,064
MMBtu
$32,640
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,386
Cost:
$530
$6,826 123,930 $802 292 - - $135 - $1,623 - $6,826
123,930
kWh
$802
292
kW-months/year
-
-
MMBtu
$135
-
$
$1,623
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$9,883
Cost:
-
$8,039 145,962 - - - - $142 - $1,702 - $8,039
145,962
kWh
-
-
kW-months/year
-
-
MMBtu
$142
-
$
$1,702
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,195
Cost:
$5,000
$10,191 185,022 $1,004 365 - - - - - - $10,191
185,022
kWh
$1,004
365
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,020
Cost:
$1,200
$3,600 65,280 $420 154 - - - - - - $3,600
65,280
kWh
$420
154
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$74,345
Cost:
$8,650
$30,327 550,535 $2,276 1,031 $5,500 1,064 $32,917 - $3,325 - $30,327
550,535
kWh
$2,276
1,031
kW-months/year
$5,500
1,064
MMBtu
$32,917
-
$
$3,325
-
$
TOTAL IMPLEMENTED Savings:
$25,098
Cost:
$6,200
$21,830 396,264 $1,424 519 - - $142 - $1,702 - $21,830
396,264
kWh
$1,424
519
kW-months/year
-
-
MMBtu
$142
-
$
$1,702
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes