IAC logo
IAC Assessment: OR0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2003
Principal Product plywood
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 0
Annual Production 108,000,000 Thousand Feet
Production Hrs. Annual 7,728
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,693 6,818,640 kWh $0.04
Electricity Demand $49,287 147,492 kW-months/year $0.33
Electricity Fees $5,724 - $ -
Natural Gas $930,389 150,773 MMBtu $6.17
TOTAL ENERGY COSTS $1,242,093
RECOMMENDED SAVINGS* $179,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $136,380
#|Description Savings
Cost
Status Natural Gas Personnel Changes Ancillary Material Cost Natural Gas Personnel Changes Ancillary Material Cost
$ MMBtu $ $ $ $
01: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$105,200
Cost:
$7,000
- - $6,200 - $99,000 - -
-
MMBtu
$6,200
-
$
$99,000
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$43,500
Cost:
$4,910
$43,500 7,050 - - - - $43,500
7,050
MMBtu
-
-
$
-
-
$
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$28,720
Cost:
$150
$28,720 5,460 - - - - $28,720
5,460
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,460
Cost:
$880
$2,460 409 - - - - $2,460
409
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$179,880
Cost:
$12,940
$74,680 12,919 $6,200 - $99,000 - $74,680
12,919
MMBtu
$6,200
-
$
$99,000
-
$
TOTAL IMPLEMENTED Savings:
$136,380
Cost:
$8,030
$31,180 5,869 $6,200 - $99,000 - $31,180
5,869
MMBtu
$6,200
-
$
$99,000
-
$
Savings
Cost
$ MMBtu $ $ $ $
Natural Gas Personnel Changes Ancillary Material Cost Natural Gas Personnel Changes Ancillary Material Cost