Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2003 |
Principal Product | plywood |
NAICS | 321212 - Softwood Veneer and Plywood Manufacturing |
SIC | 2436 - Softwood Veneer And Plywood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 108,000,000 Thousand Feet |
Production Hrs. Annual | 7,728 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $256,693 | 6,818,640 | kWh | $0.04 |
Electricity Demand | $49,287 | 147,492 | kW-months/year | $0.33 |
Electricity Fees | $5,724 | - | $ | - |
Natural Gas | $930,389 | 150,773 | MMBtu | $6.17 |
TOTAL ENERGY COSTS | $1,242,093 | |||
RECOMMENDED SAVINGS* | $179,880 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $136,380 |
#|Description |
Savings Cost |
Status | Natural Gas | Personnel Changes | Ancillary Material Cost | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
Savings: $105,200 Cost: $7,000 |
- | - | $6,200 | - | $99,000 | - |
- - MMBtu |
$6,200 - $ |
$99,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $43,500 Cost: $4,910 |
$43,500 | 7,050 | - | - | - | - |
$43,500 7,050 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $28,720 Cost: $150 |
$28,720 | 5,460 | - | - | - | - |
$28,720 5,460 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,460 Cost: $880 |
$2,460 | 409 | - | - | - | - |
$2,460 409 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $179,880 Cost: $12,940 |
$74,680 | 12,919 | $6,200 | - | $99,000 | - | $74,680 12,919 MMBtu |
$6,200 - $ |
$99,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $136,380 Cost: $8,030 |
$31,180 | 5,869 | $6,200 | - | $99,000 | - | $31,180 5,869 MMBtu |
$6,200 - $ |
$99,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Personnel Changes | Ancillary Material Cost | Natural Gas | Personnel Changes | Ancillary Material Cost |