IAC Assessment: OR0457
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0457
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Frozen Vegetables
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 287,300
Annual Production 254,000,000 Thousand Feet
Production Hrs. Annual 4,368
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,876 12,810,450 kWh $0.05
Electricity Demand $120,941 293,784 kW-months/year $0.41
Electricity Fees $101,175 - $ -
Natural Gas $117,440 16,806 MMBtu $6.99
TOTAL ENERGY COSTS $1,020,432
RECOMMENDED SAVINGS* $96,560 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$24,600
Cost:
$25,000
$20,450 385,000 $4,150 70 - - $20,450
385,000
kWh
$4,150
70
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,140
Cost:
$10,000
$5,070 95,300 $1,070 18 - - $5,070
95,300
kWh
$1,070
18
kW-months/year
-
-
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$31,300
Cost:
-
$26,300 495,000 $5,000 84 - - $26,300
495,000
kWh
$5,000
84
kW-months/year
-
-
MMBtu
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$13,100
Cost:
$42,000
$11,600 219,000 $1,500 25 - - $11,600
219,000
kWh
$1,500
25
kW-months/year
-
-
MMBtu
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$18,900
Cost:
-
$18,900 355,000 - - - - $18,900
355,000
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$2,520
Cost:
$300
- - - - $2,520 492 -
-
kWh
-
-
kW-months/year
$2,520
492
MMBtu
TOTAL RECOMMENDED Savings:
$96,560
Cost:
$77,300
$82,320 1,549,300 $11,720 197 $2,520 492 $82,320
1,549,300
kWh
$11,720
197
kW-months/year
$2,520
492
MMBtu
TOTAL IMPLEMENTED Savings:
$77,320
Cost:
$25,300
$65,650 1,235,000 $9,150 154 $2,520 492 $65,650
1,235,000
kWh
$9,150
154
kW-months/year
$2,520
492
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas