Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Ion Guns
NAICS 334516 - Analytical Laboratory Instrument Manufacturing
SIC 3826 - Analytical Instruments
Sales $100,000,000-$500,000,000
# of Employees 380
Plant Area (Sq.Ft.) 180,000
Annual Production 36 Pieces
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $411,223 8,186,800 kWh $0.05
Electricity Demand $73,093 14,530 kW-months/year $5.03
Electricity Fees $18,655 - $ -
Natural Gas $12,256 1,398 MMBtu $8.76
TOTAL ENERGY COSTS $554,972
RECOMMENDED SAVINGS* $2,682,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,377,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,372,930
Cost:
$1,150
- - - - $(-27,070) - - - $2,400,000 - -
-
kWh
-
-
kW-months/year
$(-27,070)
-
$
-
-
$
$2,400,000
-
%
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$303,000
Cost:
$1,000
- - - - - - $(-180,000) - $483,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-180,000)
-
$
$483,000
-
%
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,290
Cost:
$2,690
$3,640 72,550 $650 131 - - - - - - $3,640
72,550
kWh
$650
131
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,910
Cost:
$875
$1,910 38,100 - - - - - - - - $1,910
38,100
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$2,682,130
Cost:
$5,715
$5,550 110,650 $650 131 $(-27,070) - $(-180,000) - $2,883,000 - $5,550
110,650
kWh
$650
131
kW-months/year
$(-27,070)
-
$
$(-180,000)
-
$
$2,883,000
-
%
TOTAL IMPLEMENTED Savings:
$2,377,220
Cost:
$3,840
$3,640 72,550 $650 131 $(-27,070) - - - $2,400,000 - $3,640
72,550
kWh
$650
131
kW-months/year
$(-27,070)
-
$
-
-
$
$2,400,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production