Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Aerospace Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 60,000
Annual Production 29,000 Pieces
Production Hrs. Annual 7,344
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,477 1,074,336 kWh $0.05
Electricity Demand $19,337 6,268 kW-months/year $3.09
Electricity Fees $72 - $ -
Natural Gas $33,342 4,330 MMBtu $7.70
TOTAL ENERGY COSTS $107,228
RECOMMENDED SAVINGS* $10,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,000
Cost:
$21,000
$3,900 77,100 $8,500 256 $(-3,400) (-450) $3,900
77,100
kWh
$8,500
256
kW-months/year
$(-3,400)
(-450)
MMBtu
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,250
Cost:
$330
$1,100 21,800 $150 5 - - $1,100
21,800
kWh
$150
5
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$220
Cost:
-
$180 3,600 $40 2 - - $180
3,600
kWh
$40
2
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,470
Cost:
$21,330
$5,180 102,500 $8,690 263 $(-3,400) (-450) $5,180
102,500
kWh
$8,690
263
kW-months/year
$(-3,400)
(-450)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,000
Cost:
$21,000
$3,900 77,100 $8,500 256 $(-3,400) (-450) $3,900
77,100
kWh
$8,500
256
kW-months/year
$(-3,400)
(-450)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas