IAC logo
IAC Assessment: OR0473
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0473
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Injection Molded Plastic
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 70,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,868 2,491,440 kWh $0.04
Electricity Demand $48,775 73,140 kW-months/year $0.67
Electricity Fees $864 - $ -
Natural Gas $2,157 193 MMBtu $11.20
TOTAL ENERGY COSTS $169,546
RECOMMENDED SAVINGS* $18,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$7,000
Cost:
$7,000
- - - - $7,000 - -
-
kWh
-
-
kW-months/year
$7,000
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,400
Cost:
$7,400
- - $7,400 370 - - -
-
kWh
$7,400
370
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,500
Cost:
$1,500
$1,200 29,400 $300 53 - - $1,200
29,400
kWh
$300
53
kW-months/year
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,530
Cost:
$2,200
$1,530 37,130 - - - - $1,530
37,130
kWh
-
-
kW-months/year
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,100
Cost:
$4,000
$1,000 23,300 $100 22 - - $1,000
23,300
kWh
$100
22
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$18,530
Cost:
$22,100
$3,730 89,830 $7,800 444 $7,000 - $3,730
89,830
kWh
$7,800
444
kW-months/year
$7,000
-
$
TOTAL IMPLEMENTED Savings:
$10,030
Cost:
$10,700
$2,730 66,530 $300 53 $7,000 - $2,730
66,530
kWh
$300
53
kW-months/year
$7,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product