Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2005 |
Principal Product | Canned vegetables and fruit |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2035 - Pickles, Sauces, And Salad Dressings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 325 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 43,000 Tons |
Production Hrs. Annual | 3,024 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $273,784 | 5,403,452 | kWh | $0.05 |
Electricity Demand | $88,851 | 12,722 | kW-months/year | $6.98 |
Electricity Fees | $22,783 | - | $ | - |
Natural Gas | $596,133 | 118,723 | MMBtu | $5.02 |
TOTAL ENERGY COSTS | $981,551 | |||
RECOMMENDED SAVINGS* | $27,470 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,520 |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Ancillary Material Cost | Electricity Usage | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,030 Cost: $6,920 |
$3,030 | 60,300 | - | - | - | - |
$3,030 60,300 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2626 AVOID FROST FORMATION ON EVAPORATORS |
Savings: $6,600 Cost: $1,500 |
$6,600 | 132,400 | - | - | - | - |
$6,600 132,400 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,300 Cost: - |
$3,300 | 65,600 | - | - | - | - |
$3,300 65,600 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $9,700 Cost: - |
$9,700 | 193,300 | - | - | - | - |
$9,700 193,300 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $920 Cost: - |
$920 | 18,300 | - | - | - | - |
$920 18,300 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $3,920 Cost: - |
$2,770 | 56,000 | $190 | - | $960 | - |
$2,770 56,000 kWh |
$190 - $ |
$960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,470 Cost: $8,420 |
$26,320 | 525,900 | $190 | - | $960 | - | $26,320 525,900 kWh |
$190 - $ |
$960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,520 Cost: $1,500 |
$9,370 | 188,400 | $190 | - | $960 | - | $9,370 188,400 kWh |
$190 - $ |
$960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Ancillary Material Cost | Electricity Usage | Personnel Changes | Ancillary Material Cost |