IAC logo
IAC Assessment: OR0476
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0476
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Door Skins
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 68
Plant Area (Sq.Ft.) 64,000
Annual Production 8,800,000 Pieces
Production Hrs. Annual 8,400
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,009,647 33,266,800 kWh $0.03
Electricity Demand $183,376 54,900 kW-months/year $3.34
Electricity Fees $40,360 - $ -
Fuel Oil #2 $495,222 56,244 MMBtu $8.80
TOTAL ENERGY COSTS $1,838,644
RECOMMENDED SAVINGS* $1,139,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,028
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$59,097
Cost:
$38,400
- - - - - - $2,216 - $56,881 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,216
-
$
$56,881
-
$
-
-
$
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,039,000
Cost:
$1,200,000
- - - - - - - - - - $1,039,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$1,039,000
-
$
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$9,028
Cost:
$600
- - - - $9,028 900 - - - - - - -
-
kWh
-
-
kW-months/year
$9,028
900
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$32,100
Cost:
$47,900
$27,100 891,900 $5,000 1,272 - - - - - - - - $27,100
891,900
kWh
$5,000
1,272
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,139,225
Cost:
$1,286,900
$27,100 891,900 $5,000 1,272 $9,028 900 $2,216 - $56,881 - $1,039,000 - $27,100
891,900
kWh
$5,000
1,272
kW-months/year
$9,028
900
MMBtu
$2,216
-
$
$56,881
-
$
$1,039,000
-
$
TOTAL IMPLEMENTED Savings:
$9,028
Cost:
$600
- - - - $9,028 900 - - - - - - -
-
kWh
-
-
kW-months/year
$9,028
900
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material Primary Product