Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Butter
NAICS 311512 - Creamery Butter Manufacturing
SIC 2021 - Creamery Butter
Sales $10,000,000-$50,000,000
# of Employees 22
Plant Area (Sq.Ft.) 58,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 5,928
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,870 1,728,760 kWh $0.05
Electricity Demand $18,797 51,264 kW-months/year $0.37
Electricity Fees $7,960 - $ -
Natural Gas $67,274 9,232 MMBtu $7.29
TOTAL ENERGY COSTS $171,901
RECOMMENDED SAVINGS* $144,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $142,780
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$116,320
Cost:
$115,000
- - - - $116,320 - -
-
kWh
-
-
MMBtu
$116,320
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$19,750
Cost:
$100
$3,320 74,922 $16,430 24,600 - - $3,320
74,922
kWh
$16,430
24,600
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,710
Cost:
$800
- - $6,710 12,816 - - -
-
kWh
$6,710
12,816
MMBtu
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,500
Cost:
-
$1,500 34,900 - - - - $1,500
34,900
kWh
-
-
MMBtu
-
-
$
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$700
Cost:
-
$700 16,400 - - - - $700
16,400
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$144,980
Cost:
$115,900
$5,520 126,222 $23,140 37,416 $116,320 - $5,520
126,222
kWh
$23,140
37,416
MMBtu
$116,320
-
$
TOTAL IMPLEMENTED Savings:
$142,780
Cost:
$115,900
$3,320 74,922 $23,140 37,416 $116,320 - $3,320
74,922
kWh
$23,140
37,416
MMBtu
$116,320
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product