IAC Assessment: OR0480
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0480
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Clean Laundry
NAICS 812332 - Industrial Launderers
SIC 7218 - Industrial Launderers
Sales $5,000,000-$10,000,000
# of Employees 140
Plant Area (Sq.Ft.) 30,000
Annual Production 16,640,000 Pounds
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,435 1,282,800 kWh $0.05
Electricity Demand $32,187 78,864 kW-months/year $0.41
Electricity Fees $6,260 - $ -
Natural Gas $132,108 31,846 MMBtu $4.15
Fuel Oil #1 $17,518 1,299 MMBtu $13.49
TOTAL ENERGY COSTS $568,013
RECOMMENDED SAVINGS* $19,978 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,068
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 3.4155 METER WASTE WATER Savings:
$14,400
Cost:
-
- - - - - - - - $14,400 1,579,028 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$14,400
1,579,028
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,175
Cost:
$3,200
$2,700 49,836 $475 8 - - - - - - $2,700
49,836
kWh
$475
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$493
Cost:
-
- - - - - - $493 332 - - -
-
kWh
-
-
kW-months/year
-
-
$
$493
332
MMBtu
-
-
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,910
Cost:
$2,000
- - - - $1,910 - - - - - -
-
kWh
-
-
kW-months/year
$1,910
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$19,978
Cost:
$5,200
$2,700 49,836 $475 8 $1,910 - $493 332 $14,400 1,579,028 $2,700
49,836
kWh
$475
8
kW-months/year
$1,910
-
$
$493
332
MMBtu
$14,400
1,579,028
Tgal
TOTAL IMPLEMENTED Savings:
$18,068
Cost:
$3,200
$2,700 49,836 $475 8 - - $493 332 $14,400 1,579,028 $2,700
49,836
kWh
$475
8
kW-months/year
-
-
$
$493
332
MMBtu
$14,400
1,579,028
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal