IAC logo
IAC Assessment: OR0483
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0483
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Coffee Syrups & Sauces
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2087 - Flavoring Extracts And Syrups, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 65,000
Annual Production 4,500,000 Pieces
Production Hrs. Annual 2,000
Location (State) Wa
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,990 1,066,960 kWh $0.06
Electricity Demand $3,909 3,795 kW-months/year $1.03
Electricity Fees $1,282 - $ -
Natural Gas $59,021 6,916 MMBtu $8.53
TOTAL ENERGY COSTS $189,365
RECOMMENDED SAVINGS* $162,695 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $157,564
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Gas Administrative Changes Electricity Usage Natural Gas Other Gas Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$21,624
Cost:
-
- - - - - - $21,624 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$21,624
-
$
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$24,290
Cost:
$4,400
$590 9,300 $1,300 270 - - $22,400 - $590
9,300
kWh
$1,300
270
MMBtu
-
-
MMBtu
$22,400
-
$
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$21,300
Cost:
$5,100
- - - - - - $21,300 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$21,300
-
$
04: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$8,960
Cost:
$3,000
- - - - - - $8,960 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$8,960
-
$
05: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$41,000
Cost:
$69,000
- - - - - - $41,000 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$41,000
-
$
06: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$40,390
Cost:
$72,000
- - - - $2,590 138 $37,800 - -
-
kWh
-
-
MMBtu
$2,590
138
MMBtu
$37,800
-
$
07: 2.2192 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS Savings:
$5,131
Cost:
$15,000
- - $5,131 5,554 - - - - -
-
kWh
$5,131
5,554
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$162,695
Cost:
$168,500
$590 9,300 $6,431 5,824 $2,590 138 $153,084 - $590
9,300
kWh
$6,431
5,824
MMBtu
$2,590
138
MMBtu
$153,084
-
$
TOTAL IMPLEMENTED Savings:
$157,564
Cost:
$153,500
$590 9,300 $1,300 270 $2,590 138 $153,084 - $590
9,300
kWh
$1,300
270
MMBtu
$2,590
138
MMBtu
$153,084
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Gas Administrative Changes Electricity Usage Natural Gas Other Gas Administrative Changes