IAC Assessment: OR0490
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Bulk flour & sugar
NAICS 311211 - Flour Milling
SIC 2041 - Flour And Other Grain Mill Products
Sales $50,000,000-$100,000,000
# of Employees 76
Plant Area (Sq.Ft.) 120,000
Annual Production 110,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,090 3,084,980 kWh $0.05
Electricity Demand $5,921 7,008 kW-months/year $0.84
Electricity Fees $2,823 - $ -
Natural Gas $11,963 1,219 MMBtu $9.81
TOTAL ENERGY COSTS $208,025
RECOMMENDED SAVINGS* $113,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $
01: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$35,000
Cost:
$1,000
- - - - - - - - - - - - $35,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
$35,000
-
$
02: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$23,500
Cost:
$1,000
- - - - - - - - - - - - $23,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
$23,500
-
$
03: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$24,000
Cost:
-
- - - - - - $24,000 388,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$24,000
388,000
lb
-
-
$
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$10,400
Cost:
$1,000
- - - - - - - - $10,400 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$10,400
-
$
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,600
Cost:
-
$630 10,600 $20 8 - - - - $6,200 - $750 - - - $630
10,600
kWh
$20
8
kW-months/year
-
-
$
-
-
lb
$6,200
-
$
$750
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,100
Cost:
$1,800
$6,500 112,200 - - - - - - $1,600 - - - - - $6,500
112,200
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$1,600
-
$
-
-
$
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,720
Cost:
-
$1,720 29,600 - - - - - - - - - - - - $1,720
29,600
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,750
Cost:
$5,600
- - - - $2,750 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,750
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$113,070
Cost:
$10,400
$8,850 152,400 $20 8 $2,750 - $24,000 388,000 $18,200 - $750 - $58,500 - $8,850
152,400
kWh
$20
8
kW-months/year
$2,750
-
$
$24,000
388,000
lb
$18,200
-
$
$750
-
$
$58,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product