IAC logo
IAC Assessment: OR0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Printers, Printer Cartridges, Visual Equip
NAICS 334118 - Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3577 - Computer Peripheral Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 3,000
Plant Area (Sq.Ft.) 2,000,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
TOTAL ENERGY COSTS -
RECOMMENDED SAVINGS* $184,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,700
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Consumption Electricity Usage Electricity Demand Electricity Fees Water Consumption
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$23,000
Cost:
$31,500
$23,000 671,000 - - - - - - $23,000
671,000
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
02: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$36,300
Cost:
$31,500
$31,200 907,200 $5,100 115 - - - - $31,200
907,200
kWh
$5,100
115
kW-months/year
-
-
$
-
-
Tgal
03: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$39,400
Cost:
$42,000
$31,400 917,800 $8,000 59 - - - - $31,400
917,800
kWh
$8,000
59
kW-months/year
-
-
$
-
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$51,600
Cost:
$105,000
- - - - - - $51,600 - -
-
kWh
-
-
kW-months/year
-
-
$
$51,600
-
Tgal
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,600
Cost:
$10,100
- - - - $16,600 - - - -
-
kWh
-
-
kW-months/year
$16,600
-
$
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$15,000
Cost:
$4,800
$15,000 224,500 - - - - - - $15,000
224,500
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,400
Cost:
$1,200
$2,400 43,000 - - - - - - $2,400
43,000
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$184,300
Cost:
$226,100
$103,000 2,763,500 $13,100 174 $16,600 - $51,600 - $103,000
2,763,500
kWh
$13,100
174
kW-months/year
$16,600
-
$
$51,600
-
Tgal
TOTAL IMPLEMENTED Savings:
$98,700
Cost:
$105,000
$85,600 2,496,000 $13,100 174 - - - - $85,600
2,496,000
kWh
$13,100
174
kW-months/year
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Water Consumption Electricity Usage Electricity Demand Electricity Fees Water Consumption