IAC logo
IAC Assessment: OR0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Fruit Puree
NAICS 311422 - Specialty Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 290
Plant Area (Sq.Ft.) 653,400
Annual Production 80,000 Tons
Production Hrs. Annual 6,336
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $154,590 7,987,180 kWh $0.02
Electricity Demand $50,081 11,180 kW-months/year $4.48
Natural Gas $2,091,106 204,269 MMBtu $10.24
TOTAL ENERGY COSTS $2,295,777
RECOMMENDED SAVINGS* $186,121 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $157,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$37,500
Cost:
$42,500
$(-6,500) (-180,000) $(-1,100) (-50) - - $29,500 2,890 $15,600 12,600 - - - - $(-6,500)
(-180,000)
kWh
$(-1,100)
(-50)
kW-months/year
-
-
$
$29,500
2,890
MMBtu
$15,600
12,600
Tgal
-
-
gal
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$23,480
Cost:
$24,300
$(-23,330) (-679,460) $(-4,080) - - - $30,890 3,090 - - - - $20,000 - $(-23,330)
(-679,460)
kWh
$(-4,080)
-
kW-months/year
-
-
$
$30,890
3,090
MMBtu
-
-
Tgal
-
-
gal
$20,000
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$17,800
Cost:
$36,000
$4,900 140,700 $1,900 47 - - - - - - $11,000 2,365 - - $4,900
140,700
kWh
$1,900
47
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$11,000
2,365
gal
-
-
$
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$50,800
Cost:
$11,300
- - - - - - - - - - - - $50,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$50,800
-
$
05: 3.7122 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING Savings:
$46,500
Cost:
-
- - - - - - - - - - - - $46,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$46,500
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,341
Cost:
$600
- - - - - - $5,341 534 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,341
534
MMBtu
-
-
Tgal
-
-
gal
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,700
Cost:
$18,300
- - - - $4,700 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,700
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$186,121
Cost:
$133,000
$(-24,930) (-718,760) $(-3,280) (-3) $4,700 - $65,731 6,514 $15,600 12,600 $11,000 2,365 $117,300 - $(-24,930)
(-718,760)
kWh
$(-3,280)
(-3)
kW-months/year
$4,700
-
$
$65,731
6,514
MMBtu
$15,600
12,600
Tgal
$11,000
2,365
gal
$117,300
-
$
TOTAL IMPLEMENTED Savings:
$157,941
Cost:
$90,400
$(-1,600) (-39,300) $800 (-3) - - $34,841 3,424 $15,600 12,600 $11,000 2,365 $97,300 - $(-1,600)
(-39,300)
kWh
$800
(-3)
kW-months/year
-
-
$
$34,841
3,424
MMBtu
$15,600
12,600
Tgal
$11,000
2,365
gal
$97,300
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes