IAC Assessment: OR0506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Franks, Hot Dogs, Bratwurst, Breakfast Sausage
NAICS 311613 - Rendering and Meat Byproduct Processing
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 306
Plant Area (Sq.Ft.) 50,000
Annual Production 1,900,000 Pounds
Production Hrs. Annual 200
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,087 912,400 kWh $0.05
Electricity Demand $12,450 2,557 kW-months/year $4.87
Natural Gas $81,604 1,300 MMBtu $62.77
TOTAL ENERGY COSTS $159,446
RECOMMENDED SAVINGS* $389,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $389,900
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$360,000
Cost:
$2,100
- - - - - - $360,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$360,000
-
$
-
-
$
-
-
$
02: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$9,000
Cost:
$2,100
- - - - - - - - - - $9,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$9,000
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,000
Cost:
-
- - - - $6,000 470 - - - - - - -
-
kWh
-
-
kW-months/year
$6,000
470
MMBtu
-
-
$
-
-
$
-
-
$
04: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$11,400
Cost:
$2,700
$8,130 137,000 $230 48 - - - - $3,040 - - - $8,130
137,000
kWh
$230
48
kW-months/year
-
-
MMBtu
-
-
$
$3,040
-
$
-
-
$
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,200
Cost:
$3,600
$1,200 21,400 - - - - - - - - - - $1,200
21,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,300
Cost:
-
- - - - - - - - $2,300 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,300
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$389,900
Cost:
$10,500
$9,330 158,400 $230 48 $6,000 470 $360,000 - $5,340 - $9,000 - $9,330
158,400
kWh
$230
48
kW-months/year
$6,000
470
MMBtu
$360,000
-
$
$5,340
-
$
$9,000
-
$
TOTAL IMPLEMENTED Savings:
$389,900
Cost:
$10,500
$9,330 158,400 $230 48 $6,000 470 $360,000 - $5,340 - $9,000 - $9,330
158,400
kWh
$230
48
kW-months/year
$6,000
470
MMBtu
$360,000
-
$
$5,340
-
$
$9,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material