IAC logo
IAC Assessment: OR0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product dimensional lumber
NAICS 333243 - Sawmill, Woodworking, and Paper Machinery Manufacturing
SIC 2421 - Sawmills And Planing Mills, General
Sales $1,000,000-$5,000,000
# of Employees 31
Plant Area (Sq.Ft.) 35,000
Annual Production 45,000 Thousand Feet
Production Hrs. Annual 2,205
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,700 3,457,000 kWh $0.04
Electricity Demand $15,400 87,700 kW-months/year $0.18
TOTAL ENERGY COSTS $151,100
RECOMMENDED SAVINGS* $524,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $507,600
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Increase in Production Electricity Usage Electricity Fees Increase in Production
$ kWh $ $ $ %
01: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$489,500
Cost:
$250,000
- - - - $489,500 - -
-
kWh
-
-
$
$489,500
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,300
Cost:
$3,500
$2,300 45,000 - - - - $2,300
45,000
kWh
-
-
$
-
-
%
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$13,700
Cost:
$35,000
$13,700 302,000 - - - - $13,700
302,000
kWh
-
-
$
-
-
%
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,100
Cost:
-
$2,100 32,000 - - - - $2,100
32,000
kWh
-
-
$
-
-
%
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,000
Cost:
-
$1,000 9,740 - - - - $1,000
9,740
kWh
-
-
$
-
-
%
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,800
Cost:
$1,300
$1,800 45,990 - - - - $1,800
45,990
kWh
-
-
$
-
-
%
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,800
Cost:
$19,200
- - $13,800 - - - -
-
kWh
$13,800
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$524,200
Cost:
$309,000
$20,900 434,730 $13,800 - $489,500 - $20,900
434,730
kWh
$13,800
-
$
$489,500
-
%
TOTAL IMPLEMENTED Savings:
$507,600
Cost:
$288,500
$18,100 379,000 - - $489,500 - $18,100
379,000
kWh
-
-
$
$489,500
-
%
Savings
Cost
$ kWh $ $ $ %
Electricity Usage Electricity Fees Increase in Production Electricity Usage Electricity Fees Increase in Production