IAC logo
IAC Assessment: OR0551
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0551
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2009
Principal Product Plywood and Veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 3,600,000
Annual Production 45,000,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,235,494 20,352,900 kWh $0.06
TOTAL ENERGY COSTS $1,235,494
RECOMMENDED SAVINGS* $247,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $217,930
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$77,191
Cost:
$50,820
$77,191 1,482,736 - - $77,191
1,482,736
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$28,529
Cost:
$42,146
$28,529 505,090 - - $28,529
505,090
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,500
Cost:
-
$29,500 546,000 - - $29,500
546,000
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$28,320
Cost:
$48,980
$28,320 456,776 - - $28,320
456,776
kWh
-
-
MMBtu
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$83,890
Cost:
$100,800
- - $83,890 257,332 -
-
kWh
$83,890
257,332
MMBtu
TOTAL RECOMMENDED Savings:
$247,430
Cost:
$242,746
$163,540 2,990,602 $83,890 257,332 $163,540
2,990,602
kWh
$83,890
257,332
MMBtu
TOTAL IMPLEMENTED Savings:
$217,930
Cost:
$242,746
$134,040 2,444,602 $83,890 257,332 $134,040
2,444,602
kWh
$83,890
257,332
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas