IAC logo
IAC Assessment: OR0559
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0559
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2010
Principal Product Cheese
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $100,000,000-$500,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 132,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $664,744 20,034,000 kWh $0.03
Electricity Demand $171,192 36,755 kW-months/year $4.66
Electricity Fees $733,350 - $ -
Natural Gas $111,272 12,365 MMBtu $9.00
TOTAL ENERGY COSTS $2,218,568
RECOMMENDED SAVINGS* $84,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$25,044
Cost:
$36,275
$12,900 383,928 $313 60 $11,831 - - - - - $12,900
383,928
kWh
$313
60
kW-months/year
$11,831
-
$
-
-
MMBtu
-
-
Tgal
02: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$7,300
Cost:
$6,712
- - - - - - - - $7,300 3,650,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,300
3,650,000
Tgal
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,126
Cost:
$1
$1,613 48,002 $513 9 - - - - - - $1,613
48,002
kWh
$513
9
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,495
Cost:
$3,495
$2,660 79,160 $835 113 - - - - - - $2,660
79,160
kWh
$835
113
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$12,771
Cost:
$40,000
$12,771 503,000 - - - - - - - - $12,771
503,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.2192 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS Savings:
$26,673
Cost:
$64,505
- - - - - - $26,673 4,460 - - -
-
kWh
-
-
kW-months/year
-
-
$
$26,673
4,460
MMBtu
-
-
Tgal
07: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$7,531
Cost:
$16,375
$7,531 79,160 - - - - - - - - $7,531
79,160
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$84,940
Cost:
$167,363
$37,475 1,093,250 $1,661 182 $11,831 - $26,673 4,460 $7,300 3,650,000 $37,475
1,093,250
kWh
$1,661
182
kW-months/year
$11,831
-
$
$26,673
4,460
MMBtu
$7,300
3,650,000
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal Electricity Usage Electricity Demand Electricity Fees Other Energy Water Disposal