IAC Assessment: OR0560
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0560
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2010
Principal Product Chopped and Whole Onions
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 35,000
Annual Production 51,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $314,719 9,336,640 kWh $0.03
Natural Gas $70,660 7,572 MMBtu $9.33
TOTAL ENERGY COSTS $385,379
RECOMMENDED SAVINGS* $186,793 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Primary Product Electricity Usage Natural Gas Administrative Changes Primary Product
$ kWh $ MMBtu $ $ $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$68,119
Cost:
$26,207
- - - - - - $68,119 - -
-
kWh
-
-
MMBtu
-
-
$
$68,119
-
$
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$37,651
Cost:
$90,666
$37,651 190,864 - - - - - - $37,651
190,864
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$8,047
Cost:
-
$8,047 239,500 - - - - - - $8,047
239,500
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$11,768
Cost:
-
$11,768 317,443 - - - - - - $11,768
317,443
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,400
Cost:
$7,001
$3,400 101,700 - - - - - - $3,400
101,700
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,450
Cost:
$23,156
- - - - $11,450 - - - -
-
kWh
-
-
MMBtu
$11,450
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$36,273
Cost:
$3,637
- - $36,273 3,887 - - - - -
-
kWh
$36,273
3,887
MMBtu
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,085
Cost:
$70,024
$10,085 225,360 - - - - - - $10,085
225,360
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$186,793
Cost:
$220,691
$70,951 1,074,867 $36,273 3,887 $11,450 - $68,119 - $70,951
1,074,867
kWh
$36,273
3,887
MMBtu
$11,450
-
$
$68,119
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Primary Product Electricity Usage Natural Gas Administrative Changes Primary Product