IAC logo
IAC Assessment: OR0564
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0564
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2010
Principal Product Plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 228
Plant Area (Sq.Ft.) 180,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,023,000 19,964,000 kWh $0.05
Electricity Demand $135,557 24,601 kW-months/year $5.51
Natural Gas $11,394 1,028 MMBtu $11.08
Wood $456,800 242,675 MMBtu $1.88
TOTAL ENERGY COSTS $1,626,751
RECOMMENDED SAVINGS* $127,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Electricity Usage Electricity Demand Wood Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$11,375
Cost:
$32,340
$9,074 212,908 $2,301 418 - - - - $9,074
212,908
kWh
$2,301
418
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,314
Cost:
$31,314
$24,881 583,785 $6,433 1,176 - - - - $24,881
583,785
kWh
$6,433
1,176
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,666
Cost:
$40,000
$7,681 180,207 $1,985 360 - - - - $7,681
180,207
kWh
$1,985
360
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,849
Cost:
$7,575
$2,849 66,857 - - - - - - $2,849
66,857
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$64,658
Cost:
$105,222
- - - - $64,658 34,350 - - -
-
kWh
-
-
kW-months/year
$64,658
34,350
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,248
Cost:
$31,290
$5,304 124,440 $205 36 - - $1,739 - $5,304
124,440
kWh
$205
36
kW-months/year
-
-
MMBtu
$1,739
-
$
TOTAL RECOMMENDED Savings:
$127,110
Cost:
$247,741
$49,789 1,168,197 $10,924 1,990 $64,658 34,350 $1,739 - $49,789
1,168,197
kWh
$10,924
1,990
kW-months/year
$64,658
34,350
MMBtu
$1,739
-
$
TOTAL IMPLEMENTED Savings:
$95,972
Cost:
$136,536
$24,881 583,785 $6,433 1,176 $64,658 34,350 - - $24,881
583,785
kWh
$6,433
1,176
kW-months/year
$64,658
34,350
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Personnel Changes Electricity Usage Electricity Demand Wood Personnel Changes