IAC Assessment: OR0565
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0565
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2011
Principal Product Canned Vaegatables
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 225
Plant Area (Sq.Ft.) 595,000
Annual Production 150,000,000 Pounds
Production Hrs. Annual 5,160
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,021,516 24,673,840 kWh $0.04
Electricity Demand $254,204 59,779 kW-months/year $4.25
Electricity Fees $74,261 - $ -
Natural Gas $800,995 136,834 MMBtu $5.85
TOTAL ENERGY COSTS $2,150,976
RECOMMENDED SAVINGS* $126,834 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119,580
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$14,900
Cost:
$9,340
$14,900 358,000 - - $14,900
358,000
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,110
Cost:
$21,715
- - $6,110 1,010 -
-
kWh
$6,110
1,010
MMBtu
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$10,300
Cost:
$17,700
$10,300 245,401 - - $10,300
245,401
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,820
Cost:
$19,210
$6,820 161,754 - - $6,820
161,754
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,900
Cost:
$10,900
$10,900 210,000 - - $10,900
210,000
kWh
-
-
MMBtu
06: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$77,370
Cost:
$96,750
- - $77,370 12,770 -
-
kWh
$77,370
12,770
MMBtu
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$434
Cost:
$1,877
$133 3,164 $301 50 $133
3,164
kWh
$301
50
MMBtu
TOTAL RECOMMENDED Savings:
$126,834
Cost:
$177,492
$43,053 978,319 $83,781 13,830 $43,053
978,319
kWh
$83,781
13,830
MMBtu
TOTAL IMPLEMENTED Savings:
$119,580
Cost:
$156,405
$36,100 813,401 $83,480 13,780 $36,100
813,401
kWh
$83,480
13,780
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas