IAC logo
IAC Assessment: OR0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 215
Plant Area (Sq.Ft.) 30,000
Annual Production 10,000,000 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,667 3,811,440 kWh $0.04
Electricity Demand $62,941 9,297 kW-months/year $6.77
Natural Gas $63,254 7,565 MMBtu $8.36
TOTAL ENERGY COSTS $281,862
RECOMMENDED SAVINGS* $117,596 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,854
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,403
Cost:
$11,403
$9,645 223,154 $1,758 245 - - - - - - - - $9,645
223,154
kWh
$1,758
245
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,687
Cost:
$1,000
$1,270 29,381 $417 58 - - - - - - - - $1,270
29,381
kWh
$417
58
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$15,142
Cost:
$6,108
$232 5,369 - - $14,910 1,949 - - - - - - $232
5,369
kWh
-
-
kW-months/year
$14,910
1,949
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,099
Cost:
$1,560
- - - - - - $3,099 405 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,099
405
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,854
Cost:
$2,854
$1,826 42,246 $22 3 - - - - $611 - $395 - $1,826
42,246
kWh
$22
3
kW-months/year
-
-
MMBtu
-
-
MMBtu
$611
-
$
$395
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$7,810
Cost:
$9,114
$5,332 123,378 $2,478 345 - - - - - - - - $5,332
123,378
kWh
$2,478
345
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.9141 Install Anaerobic Digester Savings:
$75,601
Cost:
$294,329
$32,599 754,263 - - $56,892 7,437 - - $(-13,890) - - - $32,599
754,263
kWh
-
-
kW-months/year
$56,892
7,437
MMBtu
-
-
MMBtu
$(-13,890)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$117,596
Cost:
$326,368
$50,904 1,177,791 $4,675 651 $71,802 9,386 $3,099 405 $(-13,279) - $395 - $50,904
1,177,791
kWh
$4,675
651
kW-months/year
$71,802
9,386
MMBtu
$3,099
405
MMBtu
$(-13,279)
-
$
$395
-
$
TOTAL IMPLEMENTED Savings:
$2,854
Cost:
$2,854
$1,826 42,246 $22 3 - - - - $611 - $395 - $1,826
42,246
kWh
$22
3
kW-months/year
-
-
MMBtu
-
-
MMBtu
$611
-
$
$395
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost